Overview
Attention: New Software Bug
If you bid Reserve in Layer 1 then this property is not being applied to your bid.
There is no known solution to this bug. If Reserve is your first bid choice followed by Line Bids, then we suggest you bid Clear Bid in the first layer you bid a line.
The Quick Answer
Requests a Regular Line with more days off between work blocks than the minimum specified in the default table shown below. A Work Block may contain a CQT Pairing.
Bidliner Insight
Definition of a Work Block is not the same as a sequence or one trip. A Work Block may contain back to back trips. If you don't want back to back trips. Use a restrictive work block length.
Work Block Days Off Table
Caution