Contributors
Drew Cano
Frontend Engineer
Subscribe to our newsletter
Read about our privacy policy.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Definitions
Award
Days Off
Reserve
Dashboard
Line
Pairing

Maximize Block of Days Off

Overview

The Quick Answer

Requests a Regular Line with the greatest possible number of days off in a row.

Bidliner Insight

Consider the Days Off Tab as the tie Breaker Tab.  It should choose an award solution that allows the greatest string of days off your seniority can hold.

While it is acceptable to bid multiple Days Off properties in the same layer it is generally not considered effective. Note the Priority Property below. If you bid Maximize Total Days off and Maximize Weekends Off in the same layer. Maximize Total days will take priority potentially yielding zero weekends off.

Each of  Days Off Property has an assigned System Priority to allow the System to prioritize if multiple Days Off Properties are bid in the same layer.

Priority Property

1 Maximize Total Days Off

2 *Maximize Block of Days Off

2 *Maximize String of Days Off Start

2 *Maximize String of Days Off End

3 Maximize Weekends Off

4 Maximize Weekend Days Off

5 Maximize Credit

6 Minimize TAFB

*Do not bid more than one Layer Priority 2 in the same layer.

Do not bid in the same Layer:

  • Maximize Block of Days Off
  • Maximize String of Days Off Start
  • Maximize String of Days Off End

Strategy: Consider the Days Off Tab as the tie Breaker Tab.  When you have more pairings than you need to solve The Days Off Properties, your bid will prioritize which pairings are awarded.  Each of Days Off Property has an assigned System Priority to allow the System to prioritize if multiple Days Off Properties are bid in the same layer.

Priority Property

1 Maximize Total Days Off

2 *Maximize Block of Days Off

2 *Maximize String of Days Off Start

2 *Maximize String of Days Off End

3 Maximize Weekends Off

4 Maximize Weekend Days Off

5 Maximize Credit

6 Minimize TAFB

*Do not bid more than one Layer Priority 2 in the same layer.